As-built drawings to Ashghal standards, for Lusail CP07B and Dukhan Road

At handover, as-built drawings have to match what was built and follow the authority's drawing rules, down to the layers. We updated red-line marked drawings into as-built sets for QD SBG Construction on Lusail CP07B and the Dukhan Road Project.

Entrance of the Lusail CP07B hub office, a glazed doorway behind a paved courtyard and frangipani trees

What the as-built drawings had to meet

QD SBG Construction needed as-built drawings for Lusail CP07B and the Dukhan Road Project, updated from the red-line marked drawings and set up to the required standards.

What we did

We set up the layering and the templates to the standards, so that every sheet follows the same rules.

We then updated the drawings from the red-line mark-ups received from the project, across each discipline.

What the client received

  • Structural as-built drawings
  • Architectural as-built drawings
  • Landscape as-built drawings
  • Infrastructure as-built drawings

If you are heading for handover

As-built drawings are often left to the end of a project, when the mark-ups have piled up. Setting up the right layers and templates first means fewer sheets come back for their format. Send us the red-line drawings and the authority's drawing standard.