Quantity Surveying
Quantity Surveying &Cost Consultancy
We prepare BOQs, quantity take-offs, cost estimates and tender documents for contractors, developers and consultants in Qatar, Saudi Arabia, the UAE, Oman and India, measured to POMI, CESMM4 and IS 1200.
What we deliver
Every deliverable, clearly scoped
Bills of quantities
Itemised BOQs measured to POMI, CESMM4, NRM2 or IS 1200, matched to your drawings and specification.
Quantity take-offs
Quantities measured from PDF, CAD and BIM drawings, with workings you can trace and check.
Estimates and cost plans
Early estimates and elemental cost plans that give you a budget to design and tender against.
Tender documents and bid support
Tender packages with preambles, BOQs and conditions, plus bid comparison and clarification support.
Rate analysis
Unit rates built up from labour, material, plant and overheads, ready for pricing and negotiation.
Value engineering
Cost-saving options in materials, methods and design, assessed against performance and budget.
Interim valuations
Monthly valuations and payment applications measured against work done and the contract terms.
Variations and claims
Variation pricing, measurement of changes and claims support, backed by clear records.
Final accounts
Final account preparation that reconciles variations, provisional sums and omissions for agreement.
Subcontractor billing
Measurement, certification and billing for subcontract packages, tied back to the main contract.
Bar bending schedules
Rebar cutting lists and BBS from structural drawings, with weight summaries by element.
Cash flow and scheduling
Cash-flow forecasts and Primavera P6 programmes linked to your BOQ and payment milestones.
Bill of quantities
A BOQ that fills itself in
Every line is measured from the drawings, priced and carried into a total you can trace. Scroll to watch a sample bill take shape.
| Item | Description | Unit | Qty | Rate | Amount | |||
|---|---|---|---|---|---|---|---|---|
| 1.01 | Excavation in ordinary soil | m³ | 1,240.00m³ | 28.00 | 34,720 | |||
| 1.02 | Blinding concrete C15, 75 mm | m³ | 86.40m³ | 310.00 | 26,784 | |||
| 2.01 | Reinforced concrete C35 in foundations | m³ | 412.60m³ | 395.00 | 162,977 | |||
| 2.02 | High yield reinforcement bar | t | 38.75t | 3,150.00 | 122,063 | |||
| 3.01 | Hollow blockwork, 200 mm walls | m² | 960.00m² | 62.00 | 59,520 | |||
| 4.01 | Cement plaster, 15 mm internal | m² | 2,180.00m² | 34.00 | 74,120 | |||
| 5.01 | Sand cement screed, 50 mm | m² | 845.00m² | 38.00 | 32,110 | |||
| 5.02 | Porcelain floor tiling | m² | 620.00m² | 145.00 | 89,900 | |||
| 6.01 | Emulsion paint, two coats | m² | 2,180.00m² | 16.00 | 34,880 | |||
| Grand total | Grand total | 637,074 | ||||||
Standards by region
Local codes, international standards
- Qatar
- QCS (Qatar Construction Specifications)
- Ashghal requirements
- India
- IS 1200
- International
- POMI
- CESMM4
- RICS NRM1
- RICS NRM2
- FIDIC
How we work
From your drawings to handover
Send drawings and scope
Share drawings, specifications and your brief on WhatsApp or email.
Scope and quote
We confirm what is included, the measurement standard and the formats you need, then send a quote.
Measure and price
Our QS team measures and prepares the work, with internal checks on every package.
Review and revisions
You review the draft. We resolve queries and revise against your comments.
Handover in your formats
You receive final files in Excel, PDF or your own template, ready to issue.
Quantity take-off
Every quantity measured and highlighted
A take-off marks each element as it is measured, so nothing is counted twice or missed. Scroll to watch a small building being measured, element by element.
Press and drag on the plan to measure a distance. Select a quantity to isolate it on the plan.
- Living and dining27.58 m²
- Kitchen16.03 m²
- Entrance hall18.86 m²
- Master bedroom22.64 m²
- Bedroom 29.05 m²
- Bathroom6.91 m²
In their words
What our clients say
We've collaborated with CBG for QS, structural and 3D design services on multiple occasions. They have a friendly, energetic team that always delivers quality work — even the minute details from meetings are reflected in their BOQs.
Swapnajith CVFounder & MD, Line & Space Trading & Contracting We've engaged CBG for QS services for over a year and a half, and are currently rolling out BIM implementation with their support. It has been smooth sailing and we look forward to enlisting them for our future projects.
Syed Zoha RazviPrincipal Architect, Design Management Studio First connected with CBG in late 2021 and never looked back. They've supported us with shop drawings, as-built drawings and building quantities for two years, with a strong grasp of the Qatari market and standards.
Jihad AliManaging Director, Manta Maraghi Trading & Contracting CBG has supported us with structural design, shop drawing and BOQ requirements across our past few projects. It has been a great experience and we look forward to having them onboard for future projects.
Mohamed SamiudeenGeneral Manager, Vision Development Project


On site
Measured on paper, proven on site.
A city construction site seen from the air. A building site in time-lapse.
Quantity Surveying · Questions
Straight answers
What quantity surveying services does CBG provide?
CBG provides the full quantity surveying scope: BOQs, quantity take-offs, cost estimates, tender documents, rate analysis, valuations, variations, final accounts and bar bending schedules. We also prepare programmes and cash-flow forecasts in Primavera P6. We support contractors, developers and consultants at any stage, from tender to final account.
Which countries and measurement standards do you work to?
We work on projects in Qatar, Saudi Arabia, the UAE, Oman and India, and measure to the standard your contract calls for. That means POMI, CESMM4, RICS NRM1 and NRM2, or IS 1200 in India, with contract documents aligned to FIDIC and local requirements such as QCS in Qatar.
Can you prepare a BOQ from drawings alone?
Yes. Send PDF or CAD drawings, with the specification if you have it, and we prepare the BOQ and take-off from them. Where information is missing, we list our assumptions and raise queries so that the pricing basis is clear to everyone.
Do you support contractors after award, with valuations and variations?
Yes. We prepare interim valuations, payment applications, variation pricing, claims support, subcontractor billing and final accounts. The work is measured against the contract and the drawings, so the records are ready if the client or consultant asks for backup.
What formats do you deliver in?
We deliver Excel and PDF as standard, and can work in your own BOQ template or contract format. Take-off workings, programmes and cash-flow sheets are handed over in the formats you need, so your team can edit and reuse them.
How do I get a quote for quantity surveying?
Send your drawings and scope on WhatsApp to +974 7048 5638. We review them, confirm what is included and the measurement standard, and send you a quote. You can also email info@carbonblueglobal.com.
Related services
Often needed alongside
BIM Services
BIM modelling, clash detection, 4D, 5D and model-derived drawings for contractors, developers and consultants in Qatar, the GCC and India.
MEP Design
We design HVAC, electrical, plumbing, firefighting, fire alarm and ELV systems, from calculations to coordinated layouts and MEP BOQ, for contractors, developers and consultants in Qatar, the GCC and India.
Shop Drawings & As-Built Drawings
Shop drawings and as-built drawings for all disciplines, prepared for contractors, developers and consultants in Qatar, the GCC and India.
Need engineering support? Get in touch with us.
Send your scope on WhatsApp and our team in Doha will reply.
- Projects
- +974 7048 5638
- Academy
- +91 94956 42060