Skip to content

Case study

Finishes quantities in time to price the QatarEnergy Wellness Centre

A contractor can only price finishes accurately if the quantities behind the price are right and arrive on time. For this West Bay project of about 40,000 m², we measured the ceiling, wall and floor finishes and handed over a full bill of quantities in 5 days.

Rendering of the wellness centre, a white-fronted office building on a city street in West Bay

Why the contractor needed finishes quantities quickly

The contractor needed a bill of quantities for the interior finishes of the wellness centre, a project of about 40,000 m², so that it could price them accurately and on time.

What we did

Our quantity surveyors took off the selected ceiling, wall and floor finishes from the drawings and measured them to the relevant standards.

We organised the work tightly so that the full bill of quantities was finished in 5 days and reached the contractor in time for pricing.

What the client received

  • Quantity take-off of the ceiling, wall and floor finishes
  • Full bill of quantities for the finishes, ready to price

The result

The contractor received the full bill of quantities in 5 days and was able to price in time.

If you are pricing a fit-out

Finishes are where quantities are easiest to get wrong: every room has its own ceiling, wall and floor, and a small error repeats across the whole building. Send us the drawings and your pricing date, and we will tell you what we can deliver by then.

Quantity surveying and BOQ services in Qatar

Have a project like these? Send us the scope.

Message our Doha team on WhatsApp with your drawings or scope and we will reply.